The Trump Administration and Sable have been laying the groundwork for this probably since January 21, 2025. Sable has done the reconditioning work, so with the DPA invoked, the oil is flowing or soon will.
Noisome and Bonta will try to judge-shop, though the location limits their choices. That the platforms are outside of state waters also limits their tactics, and IIRC, pumping oil into tankers instead of the pipeline is also possible.