Up to 8,000 heavy goods vehicles needed to build nine-turbine Limerick wind farm, say group
Credit: Donal O'Regan · 06 Sept 2025 · limerickleader.ie ~~
The Bruree, Charleville, Effin Wind Farm Action Group is holding a public meeting over a planned nine-turbine wind farm with a tip height of 170m in the townlands of Garrane, Ballynagoul and Creggane.
A spokesperson says to put this in perspective, the Croke Park pitch is 145 meters long – at least 25 metres shorter than the turbines.
The meeting takes place in the community hall in Bruree on Tuesday, September 9 at 7.30pm.
The action group say the Garrane Green Energy’s (GGE) planning application to An Coimisiun Pleanala (ACP) is available on the GGE website.
https://www.wind-watch.org/news/2025/09/07/up-to-8000-heavy-goods-vehicles-needed-to-build-nine-turbine-limerick-wind-farm-say-group/