Author Topic: Probe underway after another huge turbine blade snaps off at Scottish wind farm  (Read 526 times)

0 Members and 1 Guest are viewing this topic.

Offline rangerrebew

  • TBR Contributor
  • *****
  • Posts: 176,970
Probe underway after another huge turbine blade snaps off at Scottish wind farm
Credit:  By Mary Wright, 14 DEC 2024 · scottishdailyexpress.co.uk ~~
 

A probe is underway after part of a huge turbine blade sheared off at one of Scotland’s newest wind farms, triggering safety fears.


The end of a turbine blade has sheared off at Sneddon Law (Image: Rachel Connor/Facebook)

The incident happened at Sneddon Law Wind Farm in East Ayrshire – which operates 15 turbines and only opened earlier this year –when around a third of a 49 metre blade snapped off.

Campaigners warned “peoples’ lives are at risk” and have called for the wind farm to be shut down to “allow a thorough review” of the other 14 turbines that remain operational.

The Scotland Against Spin (SAS) campaign group says “by far the biggest number of incidents involving turbines are due to blade failure”. The group also pointed to recent blade damage at a wind farm in Shetland.

The £75million wind farm in a rural area of East Ayrshire is operated by Cheshire-based CWP Energy, with the turbines supplied by Danish manufacturer Vestas.

https://www.wind-watch.org/news/2024/12/15/probe-underway-after-another-huge-turbine-blade-snaps-off-at-scottish-wind-farm/
The unity of government which constitutes you one people is also now dear to you. It is justly so, for it is a main pillar in the edifice of your real independence, the support of your tranquility at home, your peace abroad; of your safety; of your prosperity; of that very liberty which you so highly prize. But as it is easy to foresee that, from different causes and from different quarters, much pains will be taken, many artifices employed to weaken in your minds the conviction of this truth.  George Washington - Farewell Address