http://www.eaglecrestenergy.com/project-description.htmlEagle Mountain is located in Southern California, one of the largest and most dynamic electricity markets in the U.S. The project will augment the transmission grid connecting the large power markets of Southern and Mid-California, helping meet the requirements of the State for significant new and replacement power sources immediately and over the next several decades. The project will also assist the State with its mandated goal of 50% of energy to come from renewable sources by 2030.
The Eagle Mountain Pumped Storage Project will generate 1,300 MW of firm, stable, and dispatchable power when needed. It will provide electricity during the peak electrical demand periods, unexpected generation outages, and help correct imbalances in the southwestern grid. Pumped Storage is the only feasible, proven technology to store energy in the off-peak and utilize it during on-peak hours. Through its ability to utilize the off-peak energy produced by windmills, solar panels, and fossil fuel plants, this single project can accomplish the equivalent of many smaller peak-energy projects. This project will also help make renewable wind and solar projects fully integrated, reliable generation sources....
Eagle Mountain Mine was operated by Kaiser Steel Corporation from 1948 to 1982 for the mining and concentrating of iron ore through excavation of four open pits located on the land. Eagle Crest Energy obtained exclusive rights to study the site for development of a hydroelectric project from the Federal Energy Regulatory Commission (“Commission” or “FERC”). Using two of the excavated open mine pits as reservoirs, the Eagle Mountain Pumped Storage Project will store water in an upper reservoir for later release through an underground power plant to the lower reservoir, generating electricity during peak hours when it is needed most.
A Preliminary Permit was issued by the Federal Energy Regulatory Commission (FERC) in 2005, and renewed in August 2008. A Draft License Application (DLA) was submitted in June 2008, and a Final License Application (FLA) was filed on June 22, 2009 by the Eagle Crest Energy Company (“ECE”). The License to construct was issued in June 2014....