Author Topic: For 40% Of The EU And US To Drive EVs, 56,000-70,000 Km² Of Land Must Be Cleared For Wind Turbines  (Read 169 times)

0 Members and 1 Guest are viewing this topic.

rangerrebew

  • Guest
For 40% Of The EU And US To Drive EVs, 56,000-70,000 Km² Of Land Must Be Cleared For Wind Turbines

By Kenneth Richard on 15. July 2021
 
A new study warns that “a massive expansion of impervious surfaces” is an inevitable consequence of having electric vehicles reach a 40% share of citizens’ driving needs.  A land area the size of Croatia (in the European Union) or West Virginia (in the United States) must be completely covered with wind turbines to meet EV-charging energy demands for 4 of every 10 vehicles.

The already-weak power capacity of wind turbines, 0.5 We m² on average, will only continue to diminish as more wind farms are added to the landscape (Miller and Keith, 2018).

Consequently, the land area that must be devoted to the erection of wind turbines to meet the ever-growing energy needs of Earth’s citizens is harrowing.

https://notrickszone.com/2021/07/15/for-40-of-the-eu-and-usa-to-drive-evs-56000-70000-km%c2%b2-of-land-must-be-cleared-for-wind-turbines/