Author Topic: USS Gerald Ford EMALS Launching System Suffers Fault During Testing Period  (Read 221 times)

0 Members and 1 Guest are viewing this topic.

rangerrebew

  • Guest
USS Gerald Ford EMALS Launching System Suffers Fault During Testing Period
By: Sam LaGrone
June 8, 2020 1:06 PM


USS Gerald R. Ford (CVN-78) returned to port Sunday after its latest at-sea testing period with mixed results. While the carrier operated with the most complex air wing to date, the ship’s Electromagnetic Aircraft Launch System (EMALS) suffered a failure that prevented the carrier from launching planes for five days, the Navy announced in a Sunday statement.

On June 2, the crew discovered a fault in the power handling system that connects the ship’s energy-generating turbines to the EMALS power system.

“The root cause of the initial fault is still being reviewed to determine the causal factors. The fault appeared in the power handling system during a manual reset of the system before flight operations,” Navy spokesman Capt. Danny Hernandez told USNI News on Monday.

https://news.usni.org/2020/06/08/uss-gerald-ford-emals-launching-system-suffers-fault-during-testing-period

rangerrebew

  • Guest
Did all the commodes work?  Did anyone find the missing weapons elevators? :whistle: