Author Topic: ‘Out Action’ for 5 Years: Nimitz-Class Nuclear Aircraft Carrier USS John C. Stennis Is Stuck at Po  (Read 169 times)

0 Members and 1 Guest are viewing this topic.

Offline rangerrebew

  • TBR Contributor
  • *****
  • Posts: 186,800
 
‘Out Action’ for 5 Years: Nimitz-Class Nuclear Aircraft Carrier USS John C. Stennis Is Stuck at Port
Story by Isaac Seitz • 20h


Key Points and Summary - The midlife overhaul of the U.S. aircraft carrier USS John C. Stennis is facing a 14-month delay, pushing its return to service to October 2026 and extending its total downtime to over five years.

-The setback is blamed on pandemic-related disruptions and the discovery of unexpected, significant component damage.


 
© Norfolk Naval Shipyard welcomed USS George H.W. Bush (CVN 77) for a Planned Incremental Availability Jan. 11. In addition to equipment maintenance, this availability will improve ship safety along with communications and combat system upgrades.

-This situation is eerily similar to the disastrous, nearly six-year overhaul of the USS George Washington.

-The prolonged absence of a key capital ship reduces the Navy’s fleet readiness and its ability to project power at a time of rising global tensions.

Aircraft Carrier USS John C. Stennis (CVN-74) Is Out of Action
https://www.msn.com/en-us/news/us/out-action-for-5-years-nimitz-class-nuclear-aircraft-carrier-uss-john-c-stennis-is-stuck-at-port/ar-AA1Onzak?ocid=widgetonlockscreen&cvid=68ee336e943748e98c675ebdabcf71cc&ei=14
"A great civilization is not conquered from without until it has destroyed itself from within. " -- Ariel Durant