Author Topic: Army UH-60 Fleet Faces 2-Year Delay in Receiving New Engines  (Read 220 times)

0 Members and 1 Guest are viewing this topic.

Offline rangerrebew

  • TBR Contributor
  • *****
  • Posts: 191,330
Army UH-60 Fleet Faces 2-Year Delay in Receiving New Engines
« on: Monday, May 08, 2023 09:30 am »
MILITARY
Army UH-60 Fleet Faces 2-Year Delay in Receiving New Engines
by SOFREP
 

The United States Army estimates that its UH-60 Black Hawk utility helicopters will have to wait two years longer than expected before receiving their next-generation engines.

The Army’s Black Hawk and Apache aircraft will use the new GE Aerospace’s T901 engine, replacing its current 1970s-era T700. Additionally, this engine is the Army’s preferred option for its Future Attack Reconnaissance Aircraft.

However, the Improved Turbine Engine Program (ITEP), which is the program tasked with building the engines, is facing delays in its production because of issues with the supply chain and the advanced manufacturing of new parts that plagued them during the onslaught of the coronavirus pandemic.

https://sofrep.com/news/army-uh-60-fleet-faces-2-year-delay-in-receiving-new-engines/
“Our government teaches the whole people by its example. If the government becomes the lawbreaker, it breeds contempt for law; it invites every man to become a law unto himself; it invites anarchy.” Louis D. Brandeis