Utility-Scale Solar: The Grim News Begins (Blue Ridge “Wind-Down’)
6 hours ago Guest Blogger
From MasterResource
By Robert Bradley Jr.
“… this was one of the hottest and most promising job sectors in the country at the end of 2024. Now, clean energy job growth is at serious risk – and with it, our overall economy.” (-Bob Keefe, below)
“Solar construction firm Blue Ridge Power issues mass worker layoff in North Carolina,” read the article in pv magazine. “The utility-scale solar engineering, procurement and construction firm filed a WARN act with the state, cutting over 500 jobs.”
Much of the rooftop solar industry is in liquidation mode, and now the central station “utility scale” solar industry is in trouble. Expect more of the same in the next months as solar subsidies and local opposition (the environmental grassroots) grows. The delayed end of the Investment Tax Credit (30 percent credit) and the Production Tax Credit (2.8 cents/kWh) will cause a rush to the exits before the credits expire at the end of 2027 (with credits at risk for projects not started by July 4, 2026).
https://wattsupwiththat.com/2025/10/09/utility-scale-solar-the-grim-news-begins-blue-ridge-wind-down/