General Category => Climate Change => Topic started by: rangerrebew on March 29, 2024, 11:18:07 am

Title: Baltimore Sun features an academic warning that climate change must be factored into rebuilding
Post by: rangerrebew on March 29, 2024, 11:18:07 am
Baltimore Sun features an academic warning that climate change must be factored into rebuilding Key Bridge: ‘How does this bridge withstand climate change?’
By Marc Morano
March 28, 2024
9:14 am
https://www.baltimoresun.com/2024/03/27/how-long-to-rebuild-key-bridge/

How long will it take to rebuild the Key Bridge following its collapse?

Excerpt: Natalie M. Scala, an associate professor at Towson University who directs the graduate program in supply chain management, said any “prudent bridge discussion” should include thinking about how the world will change over the next century, especially concerning how sea level rise could affect the port.

“If we are smart about this, we are going to ask, ‘How does this bridge withstand climate change?’” Scala said. “When [the Key Bridge] was built, ships were not this large. What kind of engineering can be done to support the kind of shipping we do now? If we take blueprints from previous bridges and open them up, we’re not really solving the question of how we got here in the first place.”

https://www.climatedepot.com/2024/03/28/baltimore-sun-features-academic-warning-that-climate-change-must-be-factored-in-for-rebuild-of-key-bridge-how-does-this-bridge-withstand-climate-change/
Title: Re: Baltimore Sun features an academic warning that climate change must be factored into rebuilding
Post by: rangerrebew on March 29, 2024, 11:19:52 am
The solution is absurdly simple.  Do like BART in San Fransicko did and put a tunnel under Chesapeake Bay. :whistle:
Title: Re: Baltimore Sun features an academic warning that climate change must be factored into rebuilding
Post by: Fishrrman on March 29, 2024, 09:56:55 pm
Agree with ranger above.

Dredge "a trench" for the tunnel, then drop in pre-fabricated sections.

This would probably get done more quickly than an entire new bridge with "approaches".

And as I've mentioned before (probably the first person on the net to to suggest it), establish a "fast ferry service" for hazardous, over-sized, and otherwise-prohibited loads.
Title: Re: Baltimore Sun features an academic warning that climate change must be factored into rebuilding
Post by: Smokin Joe on March 30, 2024, 02:09:20 am
Remember, folks, this bridge was the answer to getting hazardous and oversized cargoes to the other side without going through town. A tunnel isn't the solution for that.
Title: Re: Baltimore Sun features an academic warning that climate change must be factored into rebuilding
Post by: Fishrrman on March 30, 2024, 01:38:27 pm
Joe wrote:
"Remember, folks, this bridge was the answer to getting hazardous and oversized cargoes to the other side without going through town. A tunnel isn't the solution for that."

Then put in a ferry for them.
They need to do that RIGHT NOW.
It's going to be some years before a bridge (or a tunnel) is completed, in any case.