Author Topic: NG Finished First Major Design Review For GBSD | DoS Approves Arms Sale To Egypt | Hamworthy Pumps W  (Read 162 times)

0 Members and 1 Guest are viewing this topic.

rangerrebew

  • Guest
NG Finished First Major Design Review For GBSD | DoS Approves Arms Sale To Egypt | Hamworthy Pumps Wins Type 31 Deal
Feb 18, 2021 05:00 UTC by Defense Industry Daily staff
Americas

Northrop Grumman announced external link on February 16 that it has carried out the first major design review event for the Ground Based Strategic Deterrent (GBSD). The GBSD is being develop to replace the Minuteman III intercontinental ballistic missile. The review took place in November, 2020 over a period of three-days by a team from Northrop Grumman and the US Air Force.

The US Marine Corps 15th Marine Expeditionary Unit declared external link that the air wing on board amphibious assault ship USS Makin Island (LHD 8) has air operations in support of Operation Inherent Resolve from February 13. VMM-164 (Reinforced) is providing close air support operations and defensive counter air support operations while F-35Bs from VMFA-122 are executing long-range strike.
Middle East & Africa

General Dynamics Land Systems won a $20.7 million contract modification external link for Abrams systems technical support. Abrams is an American Main Battle Tank. The first M1 Abrams battle tanks were delivered to the US Army in 1980. A total of 3,273 M1 tanks were produced for the US Army, 4,796 M1A1 tanks were built for the US Army, 221 for the US Marines and 880 co-produced with Egypt. In 2016, the DoS approved a foreign military sale to Kuwait for the recapitalization of that country’s 218 M1A2 main battle tanks. Work under the contract modification will take place in Michigan. Estimated completion date is June 22, 2022.

https://www.defenseindustrydaily.com/ng-finished-first-major-design-review-for-gbsd-dos-approves-arms-sale-to-egypt-hamworthy-pumps-wins-type-31-deal-045295/