Radio Free Europe 11/29/2020
In Defiance Of U.S. Sanctions, Construction On German Section Of Nord Stream 2 To Resume In December
Construction on the Nord Stream 2 pipeline running under the Baltic Sea from Russia to Germany will resume in early December after a one-year pause due to U.S. sanctions.
The company Nord Stream 2 AG said on November 28 that undersea pipe-laying work will resume on a 2.6-kilometer section of each of the gas pipeline's branches within Germany’s exclusive economic zone.
German broadcaster NDR 1 Radio MV reported that construction will resume on December 5, citing an announcement by the Baltic Sea Waterways and Shipping Office in Stralsund.
In December 2019, construction on Nord Stream 2 was suspended following U.S. sanctions on the project, which will double Russian natural gas deliveries to Germany.
More:
https://www.rferl.org/a/in-defiance-of-u-s-sanctions-construction-on-german-section-of-nord-stream-2-to-resume-in-december/30974376.html