Author Topic: $3.6 Billion Needed To Rebuild Camp Lejeune Facilities Damaged By Hurricane Florence  (Read 388 times)

0 Members and 1 Guest are viewing this topic.

rangerrebew

  • Guest
$3.6 Billion Needed To Rebuild Camp Lejeune Facilities Damaged By Hurricane Florence
By: Ben Werner
December 13, 2018 11:16 AM

 

The Marine Corps is looking at a hefty construction cost to repair or replace hundreds of buildings at Marine Corps Base Camp Lejeune damaged during Hurricane Florence.

After evaluating storm damage, about 31 Military Construction (MILCON) projects on the base – not including base housing – a significant number were found to be either so damaged or so old it would be more cost-efficient to replace them, Marine Corps Commandant Gen. Robert Neller said during a Wednesday hearing of the Senate Armed Services subcommittees on seapower and readiness and management support. The rebuilding cost is estimated to be between $3.6 billion and $3.7 billion.

https://news.usni.org/2018/12/13/39623

Offline Fishrrman

  • Hero Member
  • *****
  • Posts: 35,707
  • Gender: Male
  • Dumbest member of the forum
I simply don't believe those numbers...