Author Topic: 50% remaining – CVN 79 is making progress | Super Tucanos will soar over Afghanistan | Lockheed Mart  (Read 291 times)

0 Members and 1 Guest are viewing this topic.

rangerrebew

  • Guest
50% remaining – CVN 79 is making progress | Super Tucanos will soar over Afghanistan | Lockheed Martin and Tata are teaming up
Sep 06, 2018 05:00 UTC by Defense Industry Daily staff


The US Air Force needs to overhaul the digital countermeasure receivers installed on the B-2 Spirit bombers. Lockheed Martin will be responsible to repair and modernize a number of those receivers under this $47.5 million firm-fixed-price requirements contract external link. The B-2 is a low-observable, strategic, long-range, heavy bomber capable of penetrating sophisticated and dense air-defence shields. The plane is equipped with a radar warning receiver, a defensive aids system and the Lockheed Martin AN/APR-50 defensive management system (DMS). The system, in conjunction with the radar warning receiver, detects electronic threats encountered by the B-2 and provides situational awareness to its air crew. Work will be performed at Lockheed’s facility in Oswego, New York and is expected to be completed by August, 2023

https://www.defenseindustrydaily.com/50-remaining-cvn-79-is-making-progress-super-tucanos-will-soar-over-afghanistan-lockheed-martin-and-tata-are-teaming-up-040623/