Author Topic: While You were Not Paying Attention... The Wall Is Being Built! (Slowly.)  (Read 475 times)

0 Members and 1 Guest are viewing this topic.

Offline SirLinksALot

  • Hero Member
  • *****
  • Posts: 4,417
  • Gender: Male
SOURCE: NATIONAL REVIEW

URL: https://www.nationalreview.com/2018/06/us-mexico-border-wall-being-built-slowly/#slide-1

by Jim Geraghty



The U.S. government is currently installing sections of Trump’s 30-foot-high wall in three places.

The good news for those who wish to see a wall built along the U.S.–Mexican border is that U.S. Customs and Border Protection has built seven miles of 30-foot-high wall in the past few months, and roughly 30 more miles of high fencing are slated for construction.

The bad news is that there’s still a lot of border to go.

New reports from Carlos Diaz, southwest branch chief of the U.S. Customs and Border Patrol, indicate that one of the three current wall projects is nearly complete, another is about a quarter of the way done, and one just began earlier this month.

The first border-wall construction project began in February near downtown Calexico, Calif., roughly 120 miles east of San Diego. Here, construction contractor SWF Constructors, of Omaha, Neb., is putting up a 30-foot high “bollard-style wall” to replace 2.25 miles of wall built in the 1990s out of recycled scraps of metal and steel plates. (The bollard style uses bars, so that border patrol officers can see through to the other side.)

When construction began, the agency stated, “Although the existing wall has proven effective at deterring unlawful cross border activity, smuggling organizations damaged and breached this outdated version of a border wall several hundred times during the last two years, resulting in costly repairs.” When construction began, David Kim, assistant chief patrol agent for the Border Patrol’s El Centro sector, emphasized to local media that the construction was not tied to any particular immigration debate in Washington. It was, he said, a “local tactical infrastructure project that was planned for quite some time.”

This wall project, estimated to cost about $18 million, is approaching completion, with roughly 1.8 miles — 1,171 panels – – completed as of this week.

In April, CBP began the second section near Santa Theresa, N.M., which is near the Texas–New Mexico state line. A 20-mile section of existing vehicle barrier that begins just west of the Santa Teresa Port of Entry and extending westward will be replaced with an 18- to 30-foot-high bollard-style wall. About 5.3 miles, or 3,851 panels, have been completed.

(Excerpt) Read more at above link...



« Last Edit: July 09, 2018, 06:32:49 pm by SirLinksALot »

Offline edpc

  • Hero Member
  • *****
  • Posts: 14,879
  • Gender: Male
  • Professional Misanthrope - Briefer and Boxer
Sounds more like old pre-existing sections are being replaced, slowly.
I disagree.  Circle gets the square.

Offline ABX

  • Hero Member
  • *****
  • Posts: 900
  • Words full of sound and fury, signifying nothing.
Sounds more like old pre-existing sections are being replaced, slowly.

Just a continuation of the Secure Fence Act already in place.

Offline Frank Cannon

  • Hero Member
  • *****
  • Posts: 26,097
  • Gender: Male
More tangible evidence......Trump is GOD!!!

Online GtHawk

  • Hero Member
  • *****
  • Posts: 19,193
  • Gender: Male
  • I don't believe in Trump anymore, he's an illusion
More tangible evidence......Trump is GOD!!!
Which god might that be, Loki?



 :bolt: