General Category > Science, Technology and Knowledge

1.35 Million Tonnes of “Hazardous Material”, Germany Admits No Plan To Recycle Used Wind Turbine Bla

(1/1)

rangerrebew:
1.35 Million Tonnes of “Hazardous Material”, Germany Admits No Plan To Recycle Used Wind Turbine Blades

By P Gosselin on 21. November 2020
 

Germany began installing wind turbines in earnest some 20 years ago. Now that their lifetime has been exceeded, many are being ripped down. But there’s a big problem about what to do with the leftover carbon and glass-fibre reinforced blades.

A recent report on ZDF German public television explains that currently there’s no plan in place on what to do with the turbine blades, which weigh up to 15 tonnes each.

There’s no way to recycle them to use as raw material for new blades. Currently the old blades are being shredded and the chips mixed in with concrete. “You need too much energy and power to shred them,” says Hans-Dieter Wilcken, the operator of a German recycling company.

Burning them is also not an option.

https://notrickszone.com/2020/11/21/1-35-million-tonnes-of-hazardous-material-germany-admits-no-plan-to-recycle-used-wind-turbine-blades/